B-band AST Instalační manuál Strana 9

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 16
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 8
8
9
For AST remove the adhesive protective layer from the AST.
Then stick it firmly by holding and pressing with fingers for a
short while. If necessary, you can remove the AST shortly after
attaching, but be careful when doing this. Carefully lift under
the edge of the AST, with your fingernail, and work it off slowly.
Don’t attempt to lift the AST off by pulling on the transducer
lead. Peel the adhesive off the wood, rather than peeling the
pickup off the adhesive. At installation this can be removed and
reattached two or three times.
Note! After 24 hours the adhesive will dry and it will be hard to
remove. Removal after this time may damage the pickup.
Now install the remote control. The preferred placement is at
the low E string side at the inside of the soundhole. It should be
positioned so that the wheels of the volume and mix control stick
out from the edge of the soundhole. The remote control panel
should fit on a flat surface. Clean the surface with a slightly moist
cloth and let dry before installing. Remove the tape cover at the
control panel and stick it.
Test the system before putting on the strings. To do this, plug into
an amplifier and then tap lightly on the top of the guitar to make
sure that you can hear the transducer when you tap. Another
good test is to shake the guitar when plugged into amplifier.
If anything is loose or if the transducer’s leads are touching
something you will hear it. This should not happen.
Install the strings and test the system. Now play, keep it real
and enjoy!
Zobrazit stránku 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Komentáře k této Příručce

Žádné komentáře